Engineering Standards

Our Installation and Maintenance Procedure

01

Site Evaluation

Detailed cooling load calculations and airflow assessments tailored to your commercial premises.

02

Unit Mounting

Secure positioning of indoor cassettes and outdoor condensing units with minimal operational disruption.

03

Pipework & Testing

Precision brazing, pressure testing, and vacuum evacuation prior to refrigerant charge and commissioning.

Discuss your air conditioning requirements with our engineering team.

We provide transparent technical advice and structured maintenance schedules.